The 2022 Street Reconstruction Project includes roadway improvements for 10th Street and 12th Street between D Street and J Street.
These two streets have been identified as priority pedestrian routes due to their connectivity to the schools. The existing roadway section for these streets does not include sidewalk or curb and gutter. The proposed roadway section on one side of the street to address the pedestrian corridor needs. Two sidewalks are not proposed as these streets are considered to be side streets with minimal home frontages and no curb and gutter. In addition to these improvements, sidewalks and crosswalks are proposed at the intersection of 12th Street and New Street in order to create pedestrian connectivity to US-50. Utility work is limited to the replacement of a section of sewer main that is nearing the end of its useful life.